Elbe Crossing 2 is a group of pylons providing overhead lines for four 380 kV three phase AC current circuits across the German river Elbe. It was constructed between 1976 and 1978 to supplement Elbe Crossing 1, and consists of 4 masts:
  • A 76 meter tall anchor pylon located in Lower Saxony, on the Elbe's southern banks.
  • Two carrying pylons, each 227 meters tall. One is located on the island of Lühesand and the other is near Hetlingen in Schleswig-Holstein, on the northern shore. » These pylons are the tallest pylons in Europe and the sixth tallest of the world. They stand on 95 stakes because of the unfavorable building ground. The base of each pylon measures 45×45 meters and each pylon weighs 980 tons. Crossbeams, which hold up the power cables, are located at heights of 172, 190 and 208 meters. The crossbeams span 56 meters (lowest crossbeam), 72 meters (middle crossbeam) and 57 meters (highest crossbeam). Each pylon has a self-propelled climbing elevator for maintenance of the aircraft warning lights; each elevator runs inside a steel tube in the center of the mast, around which there's a spiral staircase.

  • An 62 meter tall anchor pylon on the Schleswig-Holstein side. The enormous height of the two carrying pylons ensures that the passage height requirement of 75 meters over the Elbe demanded by German authorities is met. The height requirement ensures that large ships are able to enter Hamburg's deep water port.
       Of the 12 power cables of the Elbe crossing 2, only 6 were used immediately after construction. The others were installed for future use but grounded at the two anchor masts of the Elbe crossing 2 because of the difficulties of pulling cables over the Elbe if more capacity were needed later. In the 1990s it was decided to electrify Schleswig-Holstein's railways and to use some of the unused power lines to supply electric energy to those tracks. As a result 4 cables now carry 110 kV single phase AC current for the Deutsche Bahn.
    Image:Strommast.hetlingen.gesamt.wmt.jpg|The pylon of the Elbe 2 crossing near Hetlingen Image:Strommast.hetlingen.Unterbau.wmt.jpg|Close-up view of the construction Image:Strommast.hetlingen.detail.wmt.jpg|Detail view of the pylon
    Further Information

    Get more info on 'Elbe Crossing 2'.


    External Link Exchanges

    Do you know how hard it is to get a link from a large encyclopaedia? Well we're different and will prove it. To get a link from us just add the following HTML to your site on a relevant page:

      <a href="http://elbe_crossing_2.totallyexplained.com">Elbe Crossing 2 Totally Explained</a>

    Then simply click through this link from your web page. Our crawlers will verify your link, extract the title of your web page and instantly add a link back to it. If you like you can remove the words Totally Explained and embed the link in article text.
       As long as your link remains in place, we'll keep our link to you right here. Please play fair - our crawlers are watching. Your site must be closely related to this one's topic. Any kind of spamming, dubious practises or removing the link will result in your link from us being dropped and, potentially, your whole site being banned.



  • Copyright © 2007-8 totallyexplained.com | Licensed under the GNU Free Documentation License | Site Map
    This article contains text from the Wikipedia article Elbe Crossing 2 (History) and is released under the GFDL | RSS Version